Jalan Bukit 1A, Bentong, Pahang

Date: 13/03/2021
CC Type: CC5 (Batch Roll)
Quantity: 280m²
Location: Jalan Bukit 1A, Bentong, Pahang
Client: Majlis Perbandaran Bentong, Pahang

CC was used to protect existing slope. The existing slope has eroded due to heavy rain condition and had caused a damaged to existing house. Since slope is located behind a house, CC is suitable solution for remote area.

Project Gallery