Beaufort, Sabah

Date: November 2018
CC Type: CC5 (Batch Roll)
Quantity: 100m²
Layup: Vertical Layers
Location: Beaufort, Sabah

CC was used to protect slope of a small river from strong current during rainy season. Access to the site is very difficult especially when it rains. Using CC makes it faster and easier to complete the job.

Project Gallery