Kenyir Dam, Hulu Terengganu, Terengganu

Date: 13/04/2017 – 30/04/2017
CC Type: CC8 (Bulk Rolls)
Layup: Longitudinal Layers
Quantity: 1463m²
Location: Kenyir Dam, Hulu Terengganu, Terengganu
Client: TNB Generation
Contractor: Daengco Sdn Bhd

CC was used to lined an irrigation channel and a sump. The installation work was completed in one day excluding the excavation of the channel which took one day.