Sg Kayu Ara, Damansara, Selangor

Date: August 2018
CC Type: CC5 Batched Rolls
Layup: Vertical Layers
Quantity: 810m²
Location: Sg Kayu Ara, Damansara, Selangor

CC was used to protect a slope adjacent and under a bridge. Both side of the bridge has slope failure because of water seepage. CC was also used to cover gabion at the toe of the slope.

Project Gallery